What we’ve made

Chaldon - Homes in the greenbelt

Chaldon - Homes in the greenbelt

Made architects have modelled several proposals for 1 to 2 new build dwellings in Chaldon, Surrey. Located in the north downs and an area of outstanding natural beauty, the proposed dwelling are sympathetic to their surroundings and designed to be low impact sustainable builds. The dwellings will replace old outbuildings and will not increase the total volume of built spaces on the site.

Read More
Speranza Street
Residential, Living, Net Zero, Sustainable Design Made Architects Residential, Living, Net Zero, Sustainable Design Made Architects

Speranza Street

This Modern Method of Construction (MMC), carbon zero, residential project will deliver 8 new apartments in the Royal Borough of Greenwich; adjacent to existing apartment buildings and enjoying an un-paralleled view of the London sky-line.

We have been responsible for developing the scheme from RIBA Stage 3 (Planning) through to on-site delivery with MCD Construction.

Read More
Condover Crescent
Residential, Living, Net Zero, Sustainable Design Made Architects Residential, Living, Net Zero, Sustainable Design Made Architects

Condover Crescent

This Modern Method of Construction (MMC), carbon zero, residential project will deliver 8 new apartments in the Royal Borough of Greenwich; adjacent to existing apartment buildings and enjoying an un-paralleled view of the London sky-line.

We have been responsible for developing the scheme from RIBA Stage 3 (Planning) through to on-site delivery with MCD Construction.

Read More
Student Accommodation
Residential, Living, Net Zero, Sustainable Design Made Architects Residential, Living, Net Zero, Sustainable Design Made Architects

Student Accommodation

RIBA Stages 1-6 repurposing and recladding of Unite Student accommodation in Leicester. Providing full architectural services, alongside fire engineers, structural engineers, building control and façade engineers; working directly for a tier one contractor. Scheme involves full planning and building control submission, before being delivered over 12 months.

Read More